An independent historical project. No current affiliation with Savvis, CenturyLink, Lumen Technologies, Intira, Terremark or Verizon.

Built Before CloudEst. 300 Baud · St. Louis
← Full Archive

2015 · Intira

Founder-Supplied Data-Center Presentations (Video)

Corroborated RecollectionArchived

Two surviving video records of Tim's high-density design philosophy: the Fortress One data-center tour (hydroelectric power, seven times the electric and cooling capacity of traditional facilities, 1,500 racks, up to 30 kW per rack) embedded in the Intira chapter, and the CryptoHash One Tier 1 Bitcoin facility (in-row cooling, 5 megawatts) embedded in the Missing Pieces chapter. Original drawings, engineering plans, equipment schedules and construction records are still being assembled.

Historical material displayed for documentary and educational purposes. All trademarks and logos remain the property of their respective owners. No endorsement or current affiliation is implied.